Case 01 · Process & Mechanical · 2023
Palm oil mill, Kimanis
- Symptom
- Unplanned steam-line failures, three in eighteen months, each stopping the mill mid-crop.
- Fix
- Full header replacement staged across the low-crop window.
- Readout
- 1,200 m replaced. Changeover completed in 9 days against a 21-day plan.
Project record
Case 02 · Marine & Coastal · 2022
Berth rehabilitation, Sandakan
- Symptom
- Load rating downgraded to 3 tonnes. Half the berth closed to equipment.
- Fix
- Pile jacketing with cathodic protection, deck slab replacement across 14 bays, work sequenced around vessel calls.
- Readout
- Rating restored to 12 tonnes. Design life extended 25 years. Berth remained partially operational throughout.
Project record